A custom home
General contractor from the footings to the finished rooms: a brick shell, a tile roof, herringbone floors, a green kitchen and a dark marble bath.
- Years2022–2023
- RoleGeneral contractor
- ScopeFootings to keys





How it was built · 6 stages
Footings dug, formed and poured, then the slab.



Brick walls, precast floor slabs set by crane, the second floor through the winter.





Tile roof on, then insulation, base coat and brick slips on the facade.





Underfloor heating, screed and wiring, all done before a finish goes on.





Herringbone floors, the stair treads and the green kitchen going in.





Handed over: the dining room, the entry, the second bath and the house from the garden.