(813) 334-8775 Request a free estimate
Renovated kitchen with pendant lighting, a navy accent wall, and light wood cabinetry under a vaulted ceiling, open to the living room.
Kitchen remodeling

Layout, cabinetry, and finishes built around how you cook.

A straight answer about how long you’ll be without a kitchen. Full renovations carried from planning through finished delivery, in homes people are still living in.

Our work

Kitchens we’ve built.

The same kitchen finished: light oak cabinetry, a quartz-topped island, and wood flooring running through to the entry.
Kitchen before the remodel: oak cabinets, a white tile floor, and a raised peninsula dividing the room.
BeforeAfter
Same walls, same footprint. New cabinetry, quartz and flooring, with the plumbing staying where it was.
Renovated kitchen with pendant lighting, a navy accent wall, and light wood cabinetry under a vaulted ceiling, open to the living room.
New Tampa, FL · 2026Pendant lighting, navy accent wall
The kitchen from the hallway: full-height oak cabinets running to the ceiling, a panelled refrigerator built into the run, and the island beyond.
New Tampa, FL · 2026Full-height cabinets, panelled fridge
Finished kitchen cooking nook with light wood cabinetry, gas range, and a window view of greenery.
New Tampa, FL · 2026A bright cook’s nook
Finished kitchen with a stainless refrigerator and light wood cabinetry, hardware detail.
New Tampa, FL · 2026Light wood, clean hardware
Finished kitchen with full-height emerald cabinetry, integrated appliances, and a black waterfall island.
Irpin, UA · 2022Full-height cabinetry, waterfall island
Open living space with emerald full-height cabinetry, a black island, herringbone floor and a dining table by the window.
Irpin, UA · 2022Open kitchen, island and dining
The green kitchen from the dining side: peonies on the table, a black island with a fluted front, a built-in coffee machine in the tall cabinetry and a round black hood.
Irpin, UA · 2022Coffee station, fluted island front
Finished kitchen with a sculptural wavy light fixture, light wood cabinetry, marble waterfall island, and banquette seating.
St. Petersburg, FL · 2025Sculptural lighting, waterfall island
What it costs

Nothing on this list is an extra.

The cheap quote leaves out the parts nobody sees. Every range here is a full renovation — old kitchen out, new rough-in, new cabinetry and stone — and the free in-home assessment turns it into a fixed written proposal.

Cabinetry level
Add-ons

If your existing floor continues into the next room, replacing it inside the kitchen alone leaves a visible seam. We price both options at the assessment.

Planning range
$18,000–$30,000

Same layout · standard cabinetry

What’s in the proposal is the price. Nothing is added to it unless you approve it in writing.

Request a free estimate

What’s in the number

    Not included

      The number moves with cabinetry level, appliance package and the size of the room. Every range here includes permitting.

      How long
      2–4 weeks

      without a kitchen, from the morning demo starts to the final walkthrough.

      The number worth asking for is how long you can’t use the kitchen.

      Without a kitchenCan run to day 20
      Demo startsKitchen back, day 10 to day 20

      Two to four weeks is ten to twenty working days. The solid run is what every kitchen takes.

      2–4 weeks

      of permitting and ordering first, while nothing happens at the house.

      What you keep

      The rest of the home stays usable throughout. What you will not have for those weeks is a sink and a range. Everything else, we work around.

      What we do so it stays that way

      A dust barrier at the openings, floors protected along the route in and out, one entrance agreed with you beforehand, hours you have agreed to, and debris hauled off as it is generated rather than stacked in your driveway.

      Counters are templated against the cabinets

      Once they are in, never from drawings. That wait is the usual reason a kitchen runs long — our fabricators turn one around quickly, which is what keeps the near end of that range real.

      Nothing is torn out until the permit is in

      We permit, order and take delivery first. Nothing is torn out until the permit is in and every material is on site — and you never call the county.

      Before and after

      This is what the weeks without a kitchen buy.

      The kitchen mid-rebuild: cabinet boxes set and levelled along both walls, the island framed with no countertop yet, a ladder against the navy feature wall.
      The same kitchen finished: pendant lighting over a quartz island, the navy accent wall painted, light wood cabinetry under the vaulted ceiling.
      New Tampa · 2026Boxes set and levelled with no countertops yet: the stone is templated on the cabinets once they are in, never before.
      The kitchen mid-construction: a worker on a step ladder fitting the sculptural wavy light fixture over the island, cabinetry open and the walls still unpainted.
      The same kitchen finished: the sculptural wavy light fixture over a marble waterfall island, light wood cabinetry and banquette seating.
      St. Petersburg · 2025The fixture went up while the cabinets were still open and the walls unpainted. Same room, same fixture, in service.
      If something goes wrong
      5 years

      on the concealed rough-in. In writing, handed over at the final walkthrough.

      The longer term goes to the layer nobody can inspect.

      Once the cabinets are in, the supply and drain connections behind them are the one thing you cannot check and the one thing that has to stay dry. So they carry the longer cover, on purpose.

      • 5 years

        Concealed rough-in — the supply and drain connections, electrical and ventilation behind and beneath the cabinetry.

      • 2 years

        Workmanship — cabinet installation and levelling, countertop seating, tile, trim and finish work.

      • Manufacturer’s term

        Cabinetry, hardware, countertops and appliances, registered in your name.

      Exploded kitchen run: subfloor and framing, coordinated plumbing and electrical rough-in, cabinet carcasses, a templated stone countertop and tiled backsplash — keyed as subfloor and framing, rough-in, cabinetry, countertop and finish. 12345

      Swipe the drawing →

      1. 1Subfloor and framing
      2. 2Supply, drain and electrical rough-in — the 5-year layer
      3. 3Cabinet carcass
      4. 4Stone countertop
      5. 5Backsplash

      Checked before the cabinets go in

      • InspectionPlumbing, electrical and ventilation signed off by the county before anything closes.
      • Laser lineThe cabinet run is set to a laser line, not to the old floor.
      • TemplateCounters templated on the installed cabinets, never from drawings.
      • Leak checkSink, disposal and dishwasher run and checked under the counter.
      • Sealed backsplashA flexible sealed joint at the wall transition.

      Every layer is photographed before it is covered. Once the cabinets are set and the stone is seated, none of it can be reached again.

      Not covered

      • Normal wear
      • Storm or flood damage
      • Work performed by others
      • Alterations made after handover

      One project lead manages your kitchen, from the assessment to the final walkthrough — not a scheduling office and a separate crew who have never seen your file.

      If something does go wrong, you call the same person who ran your project — not a warranty department.

      FAQ

      Common questions.

      Pay monthly instead of all at once.

      Monthly payment options can be arranged through third-party lenders. STRUX is paid in full for the work; the loan sits between you and the lender. Home equity lines work well too. We go through the options at the assessment, once the scope and the number are real. Tell us how you plan to pay, because budget shapes scope.

      Ask about payment options
      Can I live in the house during a kitchen remodel?

      Yes. Kitchen renovations happen while you are living in the house, and the rest of the home stays usable throughout. On every job we set a dust barrier at the openings, protect the floors along the route in and out, use one entrance agreed with you beforehand, work within hours you have agreed to, and haul debris off as it is generated rather than stacking it in your driveway. What you will not have for those weeks is a sink and a range. Everything else, we work around.

      Do I need a permit for a kitchen remodel in Florida?

      Yes for anything that moves plumbing, electrical or walls, and we pull it. The permit, the inspections and the closeout are part of the job. Watch for anyone suggesting you pull an owner-builder permit yourself. That moves legal responsibility for the work onto you.

      Can the layout change, or only finishes?

      Both. Moving the sink, range or dishwasher, and removing a wall, are priced as add-ons in the selector above. A load-bearing wall is a different category of work rather than a bigger version of the first: it needs an engineer’s calculation and letter, its own permit and inspections, and a beam. We tell you plainly which one you have before anything is priced.

      How do I check that STRUX is licensed?

      Look us up yourself — Florida’s DBPR license search is public and takes a minute. Search the license number CGC1541514, or search STRUX Development LLC. Check two things: that the status reads Active, and that the name on the license is the name on the contract you are being asked to sign. STRUX is licensed and insured. Do that on every bid you are holding, not only ours.

      Look up CGC1541514 on the Florida DBPR site

      What deposit do you take, and when is the rest due?

      A 10% deposit at signing. After that every payment is tied to something you can see happen: materials when your cabinetry, tile and fixtures are ordered and delivered, a progress payment when work starts, and the final 10% only after the final inspection passes and the permit is closed out.

      We keep the deposit small on purpose. A large payment up front is the most common way a homeowner loses money on a renovation, and holding the last payment until the permit is closed is what makes sure someone actually closes it.

      When can you start?

      Two to four weeks of permitting and ordering, then your start date. We do not open a wall until the permit is approved and every material is on site. We run a small number of projects at a time, deliberately, so the honest answer is the one you get at the assessment: a date, not a season.

      Do you use subcontractors?

      Yes. In Florida plumbing, electrical and HVAC have to be performed by separately licensed trades, so every general contractor works this way — the question worth asking is who holds the contract.

      You have one agreement, and it is with STRUX. One named project lead hires, schedules, supervises and pays the trades, and the workmanship warranty is ours. You never chase a subcontractor, and you never wonder who to call.

      Can I supply my own fixtures or appliances?

      Yes for finish items: appliances, light fixtures, faucets, sometimes tile. Two conditions: it has to be on site before that stage starts, and the warranty on the item is between you and wherever you bought it. If something arrives damaged or back-ordered, the schedule moves with it.

      Rough-in components we supply ourselves. Those are the parts that get closed up inside a wall, and we warranty that layer for five years, which we can only do if we chose the parts.

      Start your project

      Ready to remodel your kitchen?

      The assessment takes 45–60 minutes and ends with a written scope and a real price range, not a ballpark. No cost, no obligation, and no pressure — we don’t do the three-hour sales visit.

      1. We review your request personally.
      2. We contact you within one business day.
      3. We schedule your free in-home assessment.
      4. You get a real price range before you decide anything.
      Phone(813) 334-8775 Emailinfo@struxdevelopment.com LicenseCGC1541514
      ServingHillsborough · Pinellas · Pasco

      Request your free estimate

      We respond within one business day.

      Your information is used only to schedule your assessment.

      Call Request a free estimate