(813) 334-8775 Free estimate

Bathroom remodel cost · Tampa Bay, 2026What a bathroom costs, in real numbers.

Our own prices, published: what each kind of bathroom costs, what moves the number and what is in it. From the general contractor who builds them.

  • Tub replacement, from$16,000
  • Walk-in shower, from$19,000
  • Primary bath, from$30,000

STRUX Development LLC · CGC1541514

Bathroom with a black freestanding tub, a wood vanity and a patterned tile shower
Bathroom · 2025

The short answer

$16,000 to $48,000, depending on the job.

Most bathroom remodels are one of three jobs. The low end of each range is a standard-size room with standard finishes; the high end is a bigger room or upgraded finishes.

The jobPrice
Tub replacement10 working days. The tub stays a tub; surround, vanity, toilet, floor and lighting are new.$16,000–$23,000
Walk-in shower10 working days. The tub comes out; a shower pan is built and tiled on site, with glass.$19,000–$28,000
Primary bathAbout 15 working days. A walk-in tiled shower and a separate tub, two mixing valves.$30,000–$48,000
Layout change, on topMove a drain or take out a wall: 3–5 more days+$3,000–$6,000

By room size

What a few real-world rooms come to.

Planning prices from our price builder: standard finishes, same layout. Your room is measured at the free assessment and priced in writing.

The roomPrice
Tub replacement, 40 sq ft, one sinkA standard 5×8 hall bath$16,000–$18,000
Tub replacement, 60 sq ft, one sink$17,800–$19,800
Walk-in shower, 40 sq ft, one sinkThe 5×8 hall bath, tub out$19,000–$21,000
Walk-in shower, 60 sq ft, one sink$20,800–$22,800
Walk-in shower, 80 sq ft, two sinks$24,200–$26,200
Primary bath, 80 sq ft, two sinks$30,000–$32,000
Primary bath, 120 sq ft, two sinks$33,700–$35,700
Primary bath, 160 sq ft, two sinks$37,500–$39,500

Price your own bathroom

What moves the price

Six things decide where you land.

  • The kind of job

    A tub that stays a tub costs least. Taking the tub out adds a shower pan built on site and glass. A primary bath has two mixing valves, more tile and more glass.

    from $16,000 · $19,000 · $30,000
  • Room size

    Tile, waterproofing, drywall, paint and lighting all grow with the floor. At standard finishes, every 20 sq ft adds about $1,800.

    about +$1,800 per 20 sq ft
  • Two sinks instead of one

    A longer vanity and top, a second sink, faucet and drain.

    about +$1,600
  • Moving things

    Moving a drain or taking out a wall means new rough-in, more inspection and 3–5 more days. Keeping the layout is the biggest saving there is.

    +$3,000 to $6,000
  • Finishes

    Standard finishes are in every price above. Designer tile or fixtures beyond the standard set are priced at the assessment, item by item.

    priced at the assessment
  • What's behind the walls

    Rot under an old tub can't be priced until it's open. We photograph it, show you and price the fix in writing. Nothing is added until you sign.

    only with your signature

In every price

What the price includes.

A complete bathroom, demolition to final inspection. The price on the proposal is the price; it changes only if you sign a change.

Not in the price: designer tile or fixtures beyond the standard set (priced at the assessment), and anything found behind the walls (priced in writing first).

  • Demolition and haul-away
  • Licensed plumbing and electrical
  • Permit, inspections and closeout
  • GoBoard, every seam sealed
  • Waterproofing flood-tested before tile
  • Tile floor, tile to the ceiling in the wet area
  • New vanity, top, faucet and toilet
  • Paint, lighting and hardware
  • Dust barriers and floor protection
  • A photo report every Friday
  • Final walkthrough with you
  • Written warranty at handover

Comparing quotes

Why two quotes for one bathroom can be thousands apart.

The gap is usually in what you can't see once the tile is up. Ask every contractor these six questions, us included.

  1. Is the shower pan built on site, or a drop-in base?Ours is built and tiled on site.
  2. Is the waterproofing tested before tile?Ours is flood-tested, then photographed, then covered.
  3. Whose name is on the permit?Ours. Never accept an owner-builder permit: it makes you legally responsible for the work.
  4. Is the price fixed in writing?Ours is. Anything found behind the walls is priced in writing before it's done.
  5. What does the warranty cover, and for how long?Ours: 5 years on everything up to and including the waterproofing, 2 years on tile.
  6. Who runs the job, and how will you hear?Our founder, with a photo report every Friday.

Cost questions

Before you budget.

Why a range, not one price?

Because two bathrooms of the same kind are never the same room. We measure yours at a free assessment, 45–60 minutes at your home, and give you one fixed price in writing. It changes only if you sign a change.

How is the payment split?

10% at signing. Then payments tied to stages you can see: materials when they're ordered, a progress payment when work starts. The last 10% is held until the permit is closed out.

How long will we be without the bathroom?

About 10 working days for a tub replacement or a walk-in shower, about 15 for a primary bath. Ten working days is two weeks on the calendar. A layout change adds 3–5 days.

What does the warranty cover?

5 years on everything up to and including the waterproofing: the rough-in, the substrate board and the membrane. 2 years on tile and finish work. Not covered: normal wear, storm or flood damage, work by others and changes after handover.

Do you take small jobs, like a new vanity?

No. We do complete bathrooms, not single repairs such as a vanity or shower glass on its own.

Is the estimate really free?

Yes, free and with no obligation. We call back within one business day to set up the assessment.

Free estimate

Get your free estimate.

Name and phone are enough. Here's what happens next.

  1. We call within one business dayA few questions and a time that suits you.
  2. The founder measures the room45–60 minutes at your home. Free, no obligation.
  3. You get a fixed price in writingRoom by room. Keep it, compare it, decide when you're ready.

Rather talk now? Call or text (813) 334-8775

STRUX Development LLC · Florida Certified General Contractor CGC1541514

What's the project? (optional)

We use your details only to arrange your estimate. Nothing is shared or sold.

Got it

Thanks. We'll call you within one business day.

  • What happens nextA 15-minute call: what you want done, roughly what it costs, and a time for the free assessment.
  • Have ready3–4 phone photos of the room and the budget you have in mind.

Call (813) 334-8775Text us