Kitchen remodel cost · Tampa Bay, 2026What a kitchen costs, cabinet by cabinet.

Our own prices, published: how a kitchen is priced, what a few common kitchens come to, and what is and isn't in the number. From the general contractor who builds them.

  • Complete kitchenfrom $15,000
  • 10×10, 14 cabinets$18,100
  • Working days10–14

STRUX Development LLC · CGC1541514

Kitchen with quartz counters and oak panels, seen from the dining end
Kitchen · 2025

The short answer

A classic 10×10 kitchen: about $18,100.

That's 14 cabinets in white Shaker, quartz counters with an undermount sink, a tile backsplash, the old kitchen out and hauled away, plumbing and power disconnected and reconnected. Here is how it adds up.

10×10 kitchen, 14 cabinets, white ShakerPrice
14 cabinets, delivered, assembled and installed$9,300
Quartz countertops and undermount sinkAbout 16 ft of counter, about 34 sq ft of stone$3,700
Tile backsplashAbout 19 ft, 18 inches high$1,600
Old kitchen out and hauled away, licensed plumber and electrician disconnect and reconnect, permit where needed, protection, running the job$3,500
The kitchen, completeabout $18,100

By size and door

Count your cabinets, find your row.

Planning prices from our price builder, same layout, no tall cabinets, no island. Count every cabinet: bottom, wall and tall.

CabinetsShaker, white or grayOther color, or slim
10A small kitchen$15,000–$15,500$15,400–$16,400
14A classic 10×10$17,600–$18,600$19,900–$20,900
20$23,400–$24,400$26,700–$27,700
24$27,200–$28,200$31,200–$32,200

Price your own kitchen

What moves the price

Six things decide where you land.

  • How many cabinets

    The cabinet count sets the length of the counter and the backsplash too. In white Shaker, each cabinet adds about $1,000 with its share of stone and tile.

    about +$1,000 a cabinet
  • Door style and color

    White or gray Shaker is the lowest price per cabinet. Shaker in another color, or slim Shaker, costs more per cabinet: about $2,300 more on a 10×10.

    $666 vs $830 a cabinet
  • Tall cabinets

    A pantry or an oven cabinet runs floor to ceiling. Each one costs more than a regular cabinet.

    +$1,000 each
  • An island

    More cabinets with finished end panels, and a second piece of quartz on top.

    about +$900
  • Changing the layout

    Moving the sink, the range or a wall means new plumbing, power and inspections: 3–5 weeks on site after 2–4 weeks of permits and ordering. Taking walls out to open the plan is engineered and priced at the assessment, from $45,000.

    +$4,000 to $7,000
  • What's behind the walls

    Damage behind old cabinets can't be priced until it's open. We show you, price the fix in writing, and do nothing until you sign.

    only with your signature

In every price

What the price includes.

A complete kitchen, not just boxes and stone. The price on the proposal is the price; it changes only if you sign a change.

Not in the price: appliances, flooring, painting, and anything found behind the walls (priced in writing first). You pick the faucet; we fit it as part of the work.

  • Old kitchen out, hauled away
  • Cabinets assembled, set to a laser line
  • Quartz templated on the standing cabinets
  • Undermount sink cut and seated
  • Tile backsplash, sealed at the counter
  • Licensed plumber and electrician
  • Permit and inspections where needed
  • Your faucet, fitted
  • Dust barriers and floor protection
  • A photo report every Friday
  • Final walkthrough with you
  • Written warranty at handover

Comparing quotes

Why two kitchen quotes can be thousands apart.

A low number often leaves out the work around the cabinets. Ask every contractor these six questions, us included.

  1. Is taking out the old kitchen included?In ours: out, hauled away, floors protected.
  2. Who disconnects and reconnects the plumbing and power?Ours: a licensed plumber and electrician, in the price.
  3. When are the countertops measured?Ours are templated on the installed cabinets, not on a drawing.
  4. Whose name is on the permit?Ours. Never accept an owner-builder permit: it makes you legally responsible for the work.
  5. What isn't in the number?Ours leaves out appliances, flooring and painting, and says so in writing.
  6. What does the warranty cover?Ours: 5 years on the concealed rough-in behind and under the cabinets, 2 years on install and finish.

Cost questions

Before you budget.

Why a range, not one price?

Because no two kitchens have the same walls. We measure yours at a free assessment, 45–60 minutes at your home, and price it cabinet by cabinet, in writing. It changes only if you sign a change.

What's the smallest kitchen you take?

$15,000 is our minimum for a complete kitchen.

How is the payment split?

10% at signing. Then payments tied to stages you can see: materials when they're ordered, a progress payment when work starts. The last 10% is held until the permit is closed out.

How long will we be without a kitchen?

In your layout, 10 to 14 working days from the morning the cabinets arrive. If the layout changes, 3 to 5 weeks on site, after 2 to 4 weeks of permits and ordering.

What does the warranty cover?

5 years on the concealed rough-in: supply, drain, electrical and ventilation behind and under the cabinets, and framing where we rebuild it. 2 years on cabinet install, counter seating, tile, trim and finish. Not covered: normal wear, storm or flood damage, work by others and changes after handover.

Is the estimate really free?

Yes, free and with no obligation. We call back within one business day to set up the assessment.

Free estimate

Get your free estimate.

Name and phone are enough. Here's what happens next.

  1. We call within one business dayA few questions and a time that suits you.
  2. The founder measures the room45–60 minutes at your home. Free, no obligation.
  3. You get a fixed price in writingRoom by room. Keep it, compare it, decide when you're ready.

Rather talk now? Call or text (813) 334-8775

STRUX Development LLC · Florida Certified General Contractor CGC1541514

What's the project? (optional)

We use your details only to arrange your estimate. Nothing is shared or sold.

Got it

Thanks. We'll call you within one business day.

  • What happens nextA 15-minute call: what you want done, roughly what it costs, and a time for the free assessment.
  • Have ready3–4 phone photos of the room and the budget you have in mind.

Call (813) 334-8775Text us